When connecting or modernizing a plant
Review how production systems, enterprise IT, and vendors connect before changing the architecture.
Prioritize cyber risks with safety, uptime, and plant operations in view.
Assess operational technology and industrial control system security with a scope shaped around safety, uptime, and plant operations.
For manufacturers, utilities, and industrial operators reviewing production systems and the connections they rely on. We scope the work with plant operations, engineering, and IT.
Review how production systems, enterprise IT, and vendors connect before changing the architecture.
Assess remote access, network separation, and recovery evidence with engineering and plant operations.
Confirm critical processes, in-scope equipment, supplier dependencies, remote access, and constraints with the people who operate the facility.
Assess how operational networks are separated, who can reach them, and how changes, backups, and monitoring are managed.
Prioritize recommendations based on safety, production continuity, equipment constraints, and available maintenance windows.
Illustrative sample
| Area | Operational impact | Owner and dependency |
|---|---|---|
| Vendor remote access | A shared access route makes it harder to attribute maintenance sessions. | Operations and vendor · confirm access windows |
| Production network boundary | An exception needs review because it links an enterprise zone with a plant service. | Plant engineering · confirm dependencies before a change |
| Recovery records | Restore evidence is missing for an in-scope engineering workstation. | OT support · plan a test in an approved window |
Example data only. We agree on report contents when we scope your engagement.
Yes. Scope and evidence collection are agreed with plant stakeholders around safety and availability. The review can begin with architecture, documentation, and existing operational evidence.
Yes. We confirm shared architecture and site-level differences so findings and corrective actions can be assigned to the appropriate owners.
We agree on critical processes, safety and uptime constraints, vendor dependencies, and evidence collection with authorized plant stakeholders.
Share the site or process in scope, your key production constraints, and the plant or engineering contacts who can help define access.